To thrive in the world of capital projects, we need a healthy dose of optimism. But there is a downside to optimism; it creates blinds spots. When optimism goes un-checked, it can cloud our critical thinking and allow us to accept unrealistic assumptions and estimates.
Simply put, optimism bias in construction projects is the tendency, unconsciously or deliberately, to overstate expected benefits and downplay the level of complexity of the project resulting in underestimates of costs and schedule.
The Construction Industry Institute’s research in this area indicates that projects often suffer from over-optimism, resulting in poor project performance.
A common example is the public sector’s receipt of federal funding approved for regional infrastructure investments including water and wastewater rehabilitation, infrastructure improvements for roads, highways and public transit/light rail development.
This funding is approved on a pre-defined time schedule and must be spent by a designated date.
This influx in investment brings with it a tremendous amount of optimism in the regions where these projects will take place. Everyone wants to see this funding stimulate the economy and deliver long term value and business investment to their communities.
Affected communities and municipal leaders want these projects completed and funded as planned, but could our optimism bias put us at risk of accepting unrealistic assumptions?
Here are two unique risk areas these infrastructure projects face where scrutiny and broad engagement of stakeholders can help us identify risks to cost and schedule estimates:
1. Renovation and rehabilitation of existing assets
These type of construction projects carry unique construction risks that must be carefully addressed, including:
2. Skilled labour availability
With so many concurrent projects working to the same completion schedule, availability and securing skilled labour in specific trades will be critical.
Ensuring your organization encourages scrutiny and broad stakeholder engagement in risk management is a proven strategy to address this optimism bias [1].
Effective Risk Management helps address common challenges including [2]:
In short, it helps protect against optimism bias.
If you are mandated to deliver a strategic project by a required completion date, or at a guaranteed maximum cost, a formal risk management process is one of the best ways to protect your project against optimism bias.
Here are a few questions to ask:
Adopting a formal risk management process that is based on best practices from the Construction Industry Institute (CII) is shown to be one of the best ways to reduce optimism bias. Even if formal risk management is relatively new to your organization, you can rapidly take advantage of Industry-specific risk identification strategies that encourage broad stakeholder participation, including:
If you’re a project leader who is motivated to improve risk management practices, we invite you to register for an upcoming Risk Management Principles & Practices virtual training course. This course introduces CII’s best practices in risk management, along with the strategies, checklists and tools to add immediate value to your capital projects.
About Valency
Valency is an implementer of best practices in construction project management that dramatically improve project performance. We are a Registered Education Provider with the Construction Industry Institute (CII) and a CCM Recertification Points Provider with the Construction Management Association of America (CMAA). Our services include:
References
[1] Construction Industry Institute, “Four-casting for Early and Accurate Predictability,” Implementation Resource 291-2, 2013.
[2] Bent Flyvbjerg, Massimo Garbuio, and Dan Lovallo, “Delusion and Deception in Large Infrastructure Projects: Two Models for Explaining and Preventing Executive Disaster,” California Management Review, vol. 51, no. 2, Winter 2009.
[3] Construction Industry Institute, “Mega-Project Assessment of Criticality Tool,” Implementation Resource 315-2, 2015.