PDRI for Small Industrial Projects follows the same methodology of all other PDRI templates (Infrastructure, Building, Industrial) as outlined here: What is PDRI?
It is a collaborative, facilitated process involving key stakeholders from a project, working through a rigorous checklist of project elements in order to mitigate risk by improving scope definition and identifying and documenting gaps. It covers:
The PDRI methodology is proven to reduce risk in capital project delivery. It promotes rigorous scope definition and a collaborative review process during front end planning.
How is PDRI for Small Industrial Projects used?
The PDRI for Small Industrial Projects should be used as early as possible in the project life cycle. Rather than a gating tool (focused on the score), the emphasis is on supporting small project teams in early risk identification, capturing action items and revealing scope concerns through open and honest discussion.
Our experience has shown that a PDRI for Small Industrial Projects assessment averages between 1 to 1.5 hours.
CII defines a small industrial project as:
By improving scope using PDRI for Small Industrial Projects, CII research has shown projects perform:
Successful implementation of PDRI for small projects will likely mean more PDRIs are conducted every year, and more trained facilitators are required. Carve makes it simple to address these needs with:
Consistency in facilitation. PDRI facilitators generally have another day job. So, Carve makes it as simple as possible to conduct a quality session. It also minimizes their effort to prepare actionable results (risks and action items) for a project team.
Portfolio leading indicators. With one system used to manage all PDRIs, portfolio managers gain an aggregate view of front end planning risk, and visibility to consistently low definition elements.
Learn best practices in scope definition to dramatically improve performance of your small projects. Get started today with Valency's Courses & Webinars.